Technopark as part of the hub and spoke model of development is expanding its activities to Kundra, Kollam, which is 63 km away from the Trivandrum Campus. This is to tap the Kerala's unique advantage of uniform talent distribution, Infrastructure and supporting IT platforms, e.g. telecom, datacom and digital exchanges, excellent infrastructure availability and back-up support. Technopark Kollam is located in 44.46 acres of prime land beside scenic Kanjirode Lake. This park is being developed as a Special Economic Zone.

 

FACT SHEET:

* Project area: 44.46 Acres

* 22 Kms. from Kollam City

* 70 Kms. from the Trivandrum International Airport

* Location: On the banks of Kanjirode lake, a tributary to Ashtamudi lake

* Type of development: SEZ

* Basic infrastructure- power, water, roads, telecom, datacom, water treatment plant STP, Executive Hostel, Health, Club, Food Court etc.

 

OFFERINGS:

* SEZ Land parcels available for IT/ITES Companies and/or developers on long lease

* SEZ Built-up space available on monthly rental basis to be ready by early 2011

 

 

WORKS IN PROGRESS (Updated on 24.11.2011)

Construction of IT Building.

 


 

 

 

Present Status


  • Structural frame work of the IT building completed.
  • Finishing works including block work, plastering and tile work is nearing to completion.
  • HVAC, Electrical, Plumbing works also progressing.
  • Structural glazing and Aluminium cladding works progressing.

 

 


 


 

 

2. Site Development, Construction of roads etc:

 

 



 

Present Status

  • Earth work excavation / filling works to formation levels for Road Work: 100% completed.
  • Excavation, DR/RR and masonry works for boundary wall foundation is in progress 100% completed.
  • RR masonry for superstructure 100% completed.
  • Drain and duct work 100 % completed.
  • Tunnel work 100 % completed.
  • Road work 100 % completed

 

 

3. 110 KV Sub station:

 

Present Status


  • Control room superstructure completed .
  • Tower erection work is nearing to completion.
  • Chain link fencing completed

 



 

 

4. 11 KV Compact Sub station:

 

Present Status :

Works completed.

 

5. Electrical Works for IT Building


Present Status

  • Cable tray work completed.
  • Cable laying work completed.
  • Conduit works and wire pulling in the typical floors completed.
  • Installation of main panels completed.
  • Erection of DG completed.

 


 


 

6. HVAC Works for IT Building.

 

Present Status

  • Plant room works in the basement floor II completed.
  • Air handling units already fixed in all floors.
  • Cooling tower work is also progressing

 


 

7. Over Head Water Tank and Water Distribution System:


Present Status


  • Concreting of  baffle walls of  overhead water tank progressing.
  • Pump house works 100% completed.

.

 


 


 

 

 

 

8. STP Works

 

Present Sta

  • RCC work of  aeration tank , clarifier tank, Interim Collection tank and Collection tank completed.
  • Biogas plant work progressing.

 


 


9. Embankment protection work

  • Gabbion Wall embankment work 100% completed. Rubble masonry work over the gabion 98% completed.

 

 


 

10.Entrance Gate Structure

  • Painting works going on.

 

 


 

11. Street Lighting works

  • Erection and Installation works are progressing

 

 


 

12. Water Supply Scheme by KWA

  • R.C.C works at the Intake well progressing.
  • Pipe laying works for 4750 m completed.
  • RCC works of Sump tank and Filter house is progressing