Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

Technopark - Kollam

TECHNOPARK Kollam Plug & Play  SBC  facilty( in SEZ. ) FULLY ALLOTTED. Please Click here for more details

 

 

Technopark as part of the hub and spoke model of development is expanding its activities to Kundra, Kollam, which is 63 km away from the Trivandrum Campus. This is to tap the Kerala's unique advantage of uniform talent distribution, Infrastructure and supporting IT platforms, e.g. telecom, datacom and digital exchanges, excellent infrastructure availability and back-up support. Technopark Kollam is located in 44.46 acres of prime land beside scenic Kanjirode Lake. This park is being developed as a Special Economic Zone.

 

FACT SHEET:

* Project area: 44.46 Acres

* 22 Kms. from Kollam City

* 70 Kms. from the Trivandrum International Airport

* Location: On the banks of Kanjirode lake, a tributary to Ashtamudi lake

* Type of development: SEZ

* Basic infrastructure- power, water, roads, telecom, datacom, water treatment plant STP, Executive Hostel, Health, Club, Food Court etc.

 

OFFERINGS:

* SEZ Land parcels available for IT/ITES Companies and/or developers on long lease

* SEZ Built-up space available on monthly rental basis to be ready by October 2013

 

 

WORKS IN PROGRESS (Updated on 26.08.2013)

Construction of IT Building.

 

 

 

 

Present Status

 

  • Finishing works are nearing completion.
  • HVAC, Electrical, Plumbing works also nearing completion.
  • Structural glazing and Aluminium cladding works are also nearing completion.

 

 

 

 

 

 

 

 

 

 

2. Site Development, Construction of roads etc:

 

 


 

Present Status


  • Earth work excavation / filling works to formation levels for Road Work: 100% completed.
  • Excavation, DR/RR and masonry works for boundary wall foundation is in progress 100% completed.
  • RR masonry for superstructure 100% completed.
  • Drain and duct work 100 % completed.
  • Tunnel work 100 % completed.
  • Road work 100 % completed

 

 

3. 110 KV Sub station:

 

Present Status

  • Waiting for testing and commissioning.
  • Tower erection work is nearing to completion.
  • Chain link fencing completed

 


 

 

4. 11 KV Compact Sub station:

 

Present Status :

Works completed.

 

5. Electrical Works for IT Building


Present Status


  • Waiting for testing and commissioning

 

 

 

 

6. HVAC Works for IT Building.

 

Present Status

  • Waiting for testing and commissioning.

 

 

 

 

 

7. Fire fighting works of IT building

 


 

Present Status

  • Waiting for testing and commissioning.

 

.

 

8. Lifts for IT building

 

Present status

  • Waiting for Testing and Commissioning.

 

 

9. Over Head Water Tank and Water Distribution System:

 

Present Status

  • Finishing works of OHWT completed.
  • Pump house works 100% completed.

 

 

 

 

 

10. STP Works

 

Present Status

  • Waiting for Testing and Commissioning.(pre-testing completed)
  • Painting works of the Biogas plant work remaining.
  • Pumps erection completed.

 

 


11. Embankment protection work

  • Gabion Wall embankment work 100% completed. Rubble masonry work over the gabion completed.
  • Gabion wall works at the boat jetty portion remaining.( work awarded to Kerala State Inland Navigation Corporation)

 

 

 

12.Entrance Gate Structure

  • All works completed.

 

 

13. Street Lighting works

  • Street lighting system installed.

 

 

 

14. Landscaping works

 

  • Planting completed fully

 

 

15. Water Supply Scheme by KWA

  • Finishing works on Intake well progressing and nearing completion.
  • Pipe laying works for full length completed.
  • Finishing works on pump house at Technopark progressing and nearing completion.
  • Finishing work of filter house going on.

 

 

 

 

16. 110 kV UG cable laying from 220 kV substation, Kundara to 110kV substation,        Technopark (Deposit work)

Present status

  • Manufacturing of UG cable completed at Factory.
  • Cable arrived from factory

 

17. Approach Road works by PWD ( Deposit work) from Kristhuraj junction to IT park

Present status

  • Road works progressing.

 

18. Interior works of SBC at the first floor of IT building at Technopark, Kollam

Present status

  • Partition works completed fully.
  • Tiling work completed fully.
  • HVAC work completed 95%.
  • Electrical works completed 95%.

 

 

 

19. Deviation road to ceramic office by PWD (Deposit work)

 

Present status

  • Land filling progressing well. ( A stretch of 50 m only remaining)

 

20.  Resurfacing works of internal roads and other miscellaneous works at Technopark, Kollam

 

Present status

  • Work awarded to the contractor

 

21. Supply and Installation of Furniture for SBC at Technopark, Kollam.

Present status

  • Work awarded to the contractor

 

 

 
  Buy Generic Levitra OnlineSuper Viagra